Kitchens & Bathrooms

Kitchen & Bathroom Fitting in North West London

A new kitchen or bathroom is one of the best investments you can make in your home. EDDI Construction Ltd handles the whole job across North West London — plumbing, tiling, electrics coordination, fitting and finishing — so you deal with one team, not five.

Call +44 7492 350404

Full or partial refurbishment

From a straight swap of an old bathroom suite to a complete kitchen rip-out and rebuild, we take on jobs of every size. We can supply and fit, or fit units you have bought yourself, and we handle everything in between — moving pipework, waterproofing, tiling, worktops and the finishing touches.

Watertight and built to last

Bathrooms and kitchens are where poor workmanship shows up fastest. We waterproof properly behind tiles, set out tiling neatly, and make sure plumbing and waste runs are done right so you are not calling anyone back a year later. Clean joints, level units and a finish you will be glad to show off.

One team, less hassle

Because our plumbers, tilers and carpenters all work together, there is no waiting around for separate contractors or arguments over who does what. We sequence the trades, keep the site tidy, and get your kitchen or bathroom back in use as quickly as the job allows.

Small bathrooms and awkward kitchens

A lot of NW London kitchens and bathrooms are not the generous squares that showroom layouts assume — they are narrow galley kitchens, boxy bathrooms in converted flats, and rooms with a soil stack or a structural wall exactly where you would rather it was not. That is normal here and it is most of what we fit. The useful work happens at the setting-out stage: deciding what can move and what cannot, where the tiling should start so the cuts land somewhere sensible, and whether relocating a waste run buys you enough space to justify the work. We would rather have that conversation before anything is ordered.

Timescales you can actually plan around

Losing a kitchen or bathroom is disruptive, so the dates matter more than they do on most jobs. We give you a realistic sequence before we start — strip-out, first-fix plumbing, plastering, tiling, fitting, second fix, finishing — and tell you which days the room is genuinely unusable. Because our own plumbers, tilers and carpenters do the work rather than subcontractors booked around other commitments, that sequence tends to hold.

What actually goes wrong behind the tiles

Nearly every failed bathroom we are called in to put right failed in the same place: the substrate and the waterproofing, not the tiles. Tile adhesive and grout are not a waterproof layer — grout is porous by nature and a shower enclosure sends water at a wall for years. In a wet area the board behind the tiles needs to be suitable for it and then tanked, with the corners and the board joints taped, because those are where movement concentrates and where a hairline crack lets water through into the structure. Getting that wrong does not show for a year or two, which is precisely what makes it expensive: by the time a stain appears on a ceiling below, the damage is in the floor rather than on the wall. We build the wet areas up properly and we would rather spend an extra day on what you will never see than come back to it.

Extraction, lighting and the things people plan last

Kitchens and bathrooms are the two rooms where the services matter as much as the units, and they are usually the last thing anyone thinks about. Extraction is the big one: a bathroom extractor has to actually vent outside rather than into a loft void, and a cooker hood that recirculates through a filter is not doing the same job as one ducted through the wall — the difference eventually shows up as condensation, black mould around a window reveal, and a kitchen that smells of last night. Lighting and sockets are the other: how many, and where, is far easier to decide with the room stripped back and the walls open than it is to retro-fit afterwards. Bathroom electrical work also has zone rules about what fitting may go where in relation to a bath or shower. We coordinate the electrics as part of the job and raise all of it at the setting-out stage, while changing your mind still costs nothing.

Kitchen & bathroom work

  • ✓Full kitchen installations
  • ✓Complete bathroom refurbishments
  • ✓Supply & fit or fit-only
  • ✓Tiling & waterproofing
  • ✓Plumbing & waste runs
  • ✓Worktops & finishing

Frequently asked questions

Can you fit a kitchen or bathroom I've already bought?

Yes. We are happy to fit units and suites you have bought yourself, or supply and fit everything for you — whichever works best for your budget.

How long does a bathroom or kitchen take?

A typical bathroom takes around 1 to 2 weeks and a full kitchen 1 to 3 weeks depending on the scope. We give you a clear timeline before we start.

Which areas do you cover?

We fit kitchens and bathrooms across North West London including Wembley, Harrow, Brent, Edgware, Kingsbury, Willesden, Cricklewood, Hendon and Stanmore.

Can you move the sink, cooker or bath to a different position?

Usually, yes — it depends on where the supply and waste runs can reasonably go. Moving a waste run is more involved than moving a tap, so we look at what your room allows and tell you what each option actually involves before you commit to a layout.

Do you handle the tiling and waterproofing as well as the fitting?

Yes. Tiling, waterproofing behind the tiles, plumbing and waste runs, worktops and finishing are all done by our own team, which is why the sequence holds and there is nobody to chase between stages.

My kitchen is a narrow galley — is that a problem?

Not at all, it is a good share of what we fit around here. The work that matters is in the setting-out: what can move, where tiling should start so the cuts land sensibly, and whether relocating a waste run buys enough space to be worth it.

Isn't grout waterproof?

No — grout is porous, and a shower sends water at a wall for years. In a wet area the board behind the tiles has to be suitable and then tanked, with joints and corners taped. That layer is what keeps water out of the structure, and it is where nearly every failed bathroom we are called to put right went wrong.

Does a bathroom extractor fan have to vent outside?

Yes. A fan discharging into a loft void is simply moving the moisture somewhere it will do more harm. We duct extraction to outside, and we raise it at setting-out stage rather than at the end, because that is when it is easy to route.

Do you sort out the electrics for a new kitchen or bathroom?

We coordinate the electrical work as part of the job. The time to decide how many sockets you want and where the lighting goes is while the walls are open, and bathrooms have zone rules about which fittings can go where near a bath or shower, so it is worth settling early.

Got a job that needs doing?

Free, no-obligation quotes across North West London.

Call +44 7492 350404

Related